Scripto Long Leads Value Guide
- Period
- 1950-1960
- Origin
- United States
- Materials
- Graphite, Cardboard
- Category
- Scripto lighter
These vintage Scripto Long Leads represent a golden era of American stationery produced by the iconic Atlanta-based manufacturer. Highly collectible for their vibrant mid-century graphic design, these cardboard boxes housed the industry-standard graphite that fueled the mechanical pencil boom of the 1950s.
What affects the value of Scripto Long Leads?
- The physical condition of the cardboard box, specifically the absence of crushed corners or fading.
- Completeness of the set, ideally containing all six original unused graphite leads.
- The presence of the original sliding mechanism and structural integrity of the inner tray.
- The era-specific graphic design, with 1950-1960 versions being more desirable than later plastic iterations.
How to Identify Scripto Long Leads?
- Look for the distinct bright blue, yellow, and red color scheme on the small cardboard slider box.
- Verify the '15c' price point printed directly on the front of the packaging.
- Ensure the box contains the original six black replacement graphite leads sized for vintage Scripto mechanical pencils.
- Check for the Scripto brand logo and 'Atlanta, Ga. Made in U.S.A.' manufacturing marks.
History of Scripto Long Leads
Scripto was founded in 1923 in Atlanta, Georgia, and became one of the largest producers of writing instruments in the world. Their 'Long Leads' became an industry standard for mechanical pencils during the mid-20th century, easily identifiable by their bright blue, yellow, and red packaging which featured the 15-cent price point for decades.
Related items
Have one in hand?
Snap it. Relic tells you what it is and what it's likely worth.
Scan yours with Relic →